progress
October 4, 2014
No, the toilet won't go there, but i thought it was funny to see it in a different place. But that is the color of our bathroom now. it is a nice warm cream color.Colton had stopped in yesterday, just in time to help EO rip out the old tub and carpet from our bathroom. As well as take apart the faucets and get them set up for the new sink. He put sealer down on the boards in front of the shower, as it tends to get wet there. Granted it should be fine once the tile is down, but he just wanted to be sure. EO got the tile set for right under the toilet and it sat to dry over night, as well as getting the bathroom painted. We figured it would be better to do it now so he didn't have to worry about getting paint on the new flooring.
Then this morning he was able to hook the toilet back up so it is up and running again. He has also laid the rest of the under layment, and will be working on putting the tile down. I really don't know if he will get all the tile laid today or not. But wow is our bathroom huge now!! That tub sure took up a lot of space. We could put a twin size bed in the bathroom if we wanted. Crazy!
He was able to get the other mirror off without it breaking, so we will have it cut down and when the new counter is installed, we will put up the smaller mirror over the sink. He also saved the trim so we can trim it out. I will post pics once the flooring is done.
Posted by Robyn Nelson.

